GRID GRUPİNŞAAT

Services

Land-for-Flats Development

Without investing capital, turn your plot or ageing building into a valuable new property — with a fair share ratio and a notarised contract.

In the land-for-flats model (kat karşılığı), the landowner contributes the land while the contractor provides the design, construction costs and project management. On completion, the units are divided according to the ratio in the contract.

Because we know zoning conditions, costs and sale values in and around Manavgat, we offer a realistic, sustainable share proposal. The whole process is written and transparent.

Land-for-Flats Development

Scope of service

  • 01

    Plot & zoning analysis

    Review of zoning status, floor-area ratio, setbacks and development potential.

  • 02

    Share proposal

    Unit list and a reasoned, written share-ratio proposal.

  • 03

    Notarised contract

    Official notarial contract with delivery time, penalty clauses and guarantees.

  • 04

    Design & permit

    Architectural, structural and MEP designs plus building permit procedures.

  • 05

    Demolition & construction

    Demolition where needed; shell and finishing works under a site manager.

  • 06

    Occupancy & title deeds

    Occupancy permit and condominium title deed procedures.

Our Process

From first meeting to handover

Every project follows the same disciplined steps, so you always know where things stand.

  1. 01

    Survey

    We inspect the site and listen to your expectations and budget.

  2. 02

    Design & quote

    We prepare the architectural solution, quantities and an itemised quote.

  3. 03

    Contract

    Scope, timeline, payment plan and warranties are put in writing.

  4. 04

    Construction

    We build under a site manager's supervision with regular reporting.

  5. 05

    Handover & warranty

    We hand over against a checklist and stay with you afterwards.

Request a quote

Free assessment of your plot

Share the block/parcel number and plot area — we'll review the zoning status and give you a written preliminary assessment.

Frequently asked questions

How is the land-for-flats share ratio determined?

The ratio depends on the plot's location, zoning and floor-area rights, the number of units, construction costs and local sale values. After the survey and zoning check we give you a written share proposal.

How is the contract secured?

The land-for-flats construction contract is drawn up officially before a notary. Delivery time, unit allocation, penalty clauses and guarantees are clearly set out.

Is rent support provided during construction?

Where an existing building is demolished and rebuilt, rent support and its duration are agreed mutually at the contract stage.

Who handles permits and occupancy approval?

We handle the design drawings, building permit, municipal and land registry procedures, and the occupancy permit.

CallWhatsAppGet a Quote